809 W 23RD ST, South Los Angeles, 90007
This permit in South Los Angeles details significant accessibility upgrades to a residential property. Due to space constraints, an incline lift has been chosen over a platform lift, and the front entry steps are being reconstructed to match interior floor elevations.
Issued on June 26, 2026, this project has an estimated cost of $50,000 and was handled by Ibca Llc. The reconstruction of the front steps has already received approval from HPOZ.
Homeowners in South Los Angeles undertaking accessibility modifications, including lift installation and stair reconstruction, should budget around $50,000.
Issued
June 26, 2026
Expires
—
License
B
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Ibca Llc · 1 permits across 1 area
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 24016-10001-09708 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Bldg-Alter/Repair |
| Status | Issued |
| Job Description | Supplemental to 24016-10000-09708: 1. INCLINE LIFT SUBSTITUTION: DUE TO SPACE LIMITATIONS, AN INCLINE LIFT HAS BEEN SUBSTITUTED FOR A PLATFORM LIFT. THE SITE SIMPLY DOESN'T HAVE ENOUGH WIDTH AT THE FRONT STAIRCASE TO FACILITATE A PLATFORM LIFT. 2. FRONT STEP RECONSTRUCTION: THE EXISTING EXTERIOR ELEVATION OF THE STAIRWAY LANDING WAS TOO LOW IN COMPARISON TO THE INTERIOR FLOOR ELEVATION. THIS REQUIRED THE FRONT ENTRY STEPS TO BE COMPLETELY RECONSTRUCTED. HPOZ APPROVED OF THIS ALREADY. |
| Floor / Unit | — |
| Estimated Cost | $50,000 |
| Approved |
| April 17, 2026 |
| Issued | June 26, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |