848 N FULLER AVE, Hollywood, 90046
Homeowners in Hollywood considering renovations might be interested in this supplemental permit for a property on N Fuller Ave. The project involves significant updates to architectural layouts, stair and balcony configurations, and roof drainage, along with necessary structural adjustments like framing and concrete work.
This building alteration project was issued on July 24, 2026, with a reported project cost of $501. The work was performed by Guild G C Inc.
Homeowners in Hollywood should note that significant structural and design updates to a property on N Fuller Ave were permitted with a project cost of $501.
Issued
July 24, 2026
Expires
—
License
Apartment
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 23010-10002-03004 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Bldg-Alter/Repair |
| Status | Issued |
| Job Description | Supplemental Permit to 23010-10000-03004 to include updates to architectural layouts, stair and balcony configurations, roof and drainage elements, and associated structural adjustments such as modified framing, revised shear walls, added concrete elements, and coordination of various details to reflect the current design intent. |
| Floor / Unit | — |
| Estimated Cost | $501 |
| Approved | December 9, 2025 |
| Issued |
| July 24, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |