Skip to content
General ConstructionWest Los AngelesPermit issued

New ADU Construction at 1914 S Barry Ave, West Los Angeles

1914 S BARRY AVE 1-2, West Los Angeles, 90025

Winston

Sinra's conciergeOnline now

Planning general construction work near West Los Angeles? I’ll scope it, price it, and line up the right pro.

Reported project cost

$500,000

As declared on the permit filing. Bldg-New.

Issued
July 1, 2026
Expires
—
License
B

What was permitted

In West Los Angeles, a new construction project is underway to build two detached, two-story Accessory Dwelling Units (ADUs). This development aligns with regulations allowing for increased housing density and is designed with NFPA 13D fire suppression systems throughout.

This permit was issued on July 1, 2026, with a substantial estimated project cost of $500,000. The contractor is noted as Unknown (1 or 2 Family Dwelling), suggesting it's likely managed by a builder specializing in residential properties.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in West Los Angeles, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number25010-10000-06546
Work permit #—
Job filing number—
Work typeBldg-New
StatusIssued
Job descriptioneplan: New 2-story two detached Accessory Dwelling Units per GCS 66323(a)(4). NFPA 13D all throughout.
Floor / unit—
Estimated cost$500,000
ApprovedDecember 19, 2025
IssuedJuly 1, 2026
Expires—
BBL—
BIN—

Related searches

accessory dwelling unitADU constructionnew constructionWest Los AngelesLos Angeles2-story$500,000 project