856 E 25TH ST 1-3, Southeast Los Angeles, 90011
This permit authorizes the construction of a new two-story duplex with an attached Accessory Dwelling Unit (ADU) in Southeast Los Angeles. The project adheres to specific LAMC regulations and includes building-wide sprinkler systems.
Issued on May 20, 2026, this substantial new construction project has an estimated cost of $350,000. The contractor is noted as unknown for a 1 or 2 family dwelling.
For Southeast Los Angeles, a new 2-story duplex with an ADU represents a significant investment, with an estimated project cost of $350,000, reflecting the scale of new residential development.
Issued
May 20, 2026
Expires
—
License
B
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Golden Point Construction · 6 permits across 3 areas
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 25010-20000-05179 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Bldg-New |
| Status | Issued |
| Job Description | [ePlan] NEW 2-STORY DUPLEX AND ATACHED ADU PER LAMC 12.22 A.33 (c) and (e) (FRONT LOT)-BLDG SPRINKLERED THRU-OUT |
| Floor / Unit | — |
| Estimated Cost | $350,000 |
| Approved | October 31, 2025 |
| Issued | May 20, 2026 |
| Expires |
| — |
| BBL | — |
| BIN | — |