What was permitted
An interior remodel is underway at 11702 Pollyanna Ave in Austin, focusing on transforming existing bathrooms. The project involves combining two half-baths into a single primary bathroom without altering the overall footprint.
This building permit was issued on September 25, 2026, and is active. The scope includes sheetrock work in the hallway due to HVAC relocation, with Charly Spiker listed as the General Contractor. The project cost is not reported.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-125788 BP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Building Permit · Addition and Remodel |
| Status | Active |
| Job description | Interior remodel combining existing side-by-side half bath and full bath into one single primary bath. The basic area footprint of the bathroom space is not changing in size. Additional sheetrock work needed in the hallway outside the bathroom to enclose the area that previously housed the old HVAC system. A new unit was relocated and installed in the attic. |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | September 8, 2026 |
| Issued | September 25, 2026 |
| Expires | April 5, 2027 |
| BBL | — |
| BIN | — |
Related searches