EV Charging Installation at 1205 1/2 W 4th St, Austin

1205 1/2 W 4TH ST, 78703

Winston

Sinra's conciergeOnline now

Planning general construction work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

Not reported

The filer did not disclose a cost on this permit. Building Permit · New.

Issued
June 25, 2026
Expires
February 20, 2027
License
General Contractor

What was permitted

This permit at 1205 1/2 W 4th St in Austin indicates a significant upgrade for electric vehicle owners. Tesla is installing multiple charging stations, including cabinets, posts, and necessary electrical infrastructure like a transformer.

This building permit is active and was issued on June 25, 2026. The project cost is not provided, but the scope suggests a commercial or multi-unit residential installation, managed by AEC Systems, LLC.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-034912 BP
Work permit #—
Job filing number—
Work typeBuilding Permit · New
StatusActive
Job descriptionTesla proposing to add EV charging to existing parking. Includes the installation of 3 PSU which include 3 cabinets 24 charging posts 6 luminaires 1 Tesla site controller 1 switchboard assembly 1 utility transformer 1 meter 1 primary metering cabinet
Floor / unit—
Estimated costNot reported
ApprovedFebruary 24, 2026
IssuedJune 25, 2026
ExpiresFebruary 20, 2027
BBL—
BIN—