What was permitted
This permit at 1205 1/2 W 4th St in Austin indicates a significant upgrade for electric vehicle owners. Tesla is installing multiple charging stations, including cabinets, posts, and necessary electrical infrastructure like a transformer.
This building permit is active and was issued on June 25, 2026. The project cost is not provided, but the scope suggests a commercial or multi-unit residential installation, managed by AEC Systems, LLC.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-034912 BP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Building Permit · New |
| Status | Active |
| Job description | Tesla proposing to add EV charging to existing parking. Includes the installation of 3 PSU which include 3 cabinets 24 charging posts 6 luminaires 1 Tesla site controller 1 switchboard assembly 1 utility transformer 1 meter 1 primary metering cabinet |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | February 24, 2026 |
| Issued | June 25, 2026 |
| Expires | February 20, 2027 |
| BBL | — |
| BIN | — |