General ConstructionPermit issued

New EV Charger Installation at 1304 MARIPOSA DR BLDG 3, Austin

1304 MARIPOSA DR BLDG 3, 78704

Winston

Sinra's conciergeOnline now

Planning general construction work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

$9,361

As declared on the permit filing. Building Permit · New.

Issued
November 11, 2026
Expires
May 11, 2027
License
General Contractor

What was permitted

This permit covers the installation of significant electrical infrastructure for electric vehicle charging. It includes two Level 2 chargers, a 150A panel, a 200A meter, and associated breakers, along with a dual charger pedestal, safety bollards, and EV signage.

This project is actively moving forward, having been issued on November 11, 2026. The reported project cost for this new installation is $9,361, handled by General Contractor Envirospark Energy Solutions.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2024-156345 BP
Work permit #—
Job filing number—
Work typeBuilding Permit · New
StatusActive
Job description-(2)Lvl 2 Chargers-(1) 150A Panel-(1) 200A Meter-(1) 150A Main Breaker/(2)40A/2P Breakers-91) dual charger pedestal w/ cable management-(2) Safety Bollards-(1) EV Sign-Paint (2) EV Stencil
Floor / unit—
Estimated cost$9,361
ApprovedOctober 21, 2024
IssuedNovember 11, 2026
ExpiresMay 11, 2027
BBL—
BIN—