What was permitted
A new 240-square-foot pre-fabricated aluminum covered walkway is being installed at the Eastside campus entrance. This project aims to provide weather protection for those arriving at the building, with six concrete footings to support the structure.
This building permit is active and was issued on July 16, 2026. The reported project cost is $47,000, and the general contractor is Austin International School.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-086295 BP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Building Permit · New |
| Status | Active |
| Job description | Installation of a 240 sf (8 ft x 30 ft) pre-fabricated aluminum covered walkway at the Eastside campus entrance to provide weather protection from the drop-off point to the building. Scope includes laying out and placing 6 concrete footings to support structural columns. All work to be completed per engineering specifications. |
| Floor / unit | — |
| Estimated cost | $47,000 |
| Approved | June 17, 2026 |
| Issued | July 16, 2026 |
| Expires | February 20, 2027 |
| BBL | — |
| BIN | — |
Related searches