What was permitted
This project involves preparing existing surfaces for the installation of electric vehicle (EV) chargers and a lit canopy at 2211 S IH 35 SVRD NB in Austin. The work also includes grading to ensure ADA compliance for the EV charging stations.
The permit was issued on October 9, 2026, and includes the installation of a utility transformer and switchboard assembly, along with four 400KW EV chargers. Bear Utilities, LLC is the general contractor for this upgrade.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2025-158719 BP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Building Permit · Remodel |
| Status | Active |
| Job description | Demolition of existing surfaces for the installation of EV chargers and lit canopy. Grading of surfaces associated with EVSE to comply with ADA requirements. Install (1) utility transformer Install (1) switchboard assembly. Install (4) 400KW ALPITRONIC HYC400 EV chargers. Install (7) EV sign posts. Install (1) accessible EV sign posts. |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | October 9, 2025 |
| Issued | October 9, 2026 |
| Expires | April 8, 2027 |
| BBL | — |
| BIN | — |