What was permitted
This building permit details a significant remodel project at 3600 Presidential Blvd in Austin, focused on enhancing security and operational visibility. The work involves constructing structural towers for camera installation, along with new electrical and mechanical systems to support a Virtual Ramp Control System.
The permit is active and was issued on June 15, 2026. While the specific project cost is not disclosed, this type of infrastructure upgrade for an airport facility typically represents a substantial investment. Hensel Phelps Construction Co. is listed as the General Contractor for this project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-066212 BP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Building Permit · Remodel |
| Status | Active |
| Job description | Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits] |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | March 30, 2026 |
| Issued | June 15, 2026 |
| Expires | April 5, 2027 |
| BBL | — |
| BIN | — |