What was permitted
A permit for new driveway and sidewalks has been issued for the property at 1102 W 9th St in Austin. This permit indicates recent improvements to the property's exterior access and pedestrian pathways.
Issued on May 21, 2026, this permit is active, and the work has been reported as complete by the contractor, Michael and Mary Helen Fabacher. It's noted that ROW (Right of Way) review and approval were pending, which is a common step for such exterior projects.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Old west austin, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2015-043752 DS |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Driveway / Sidewalks · New |
| Status | Final |
| Job description | Per Yohan Faulk-J Pinnelli Company-yohan@pinnelli.com(GC) work already complete. The request was not reviewed/approved by ROW. ROW has not reviewed the temporary traffic control proposed for this request and assumes no liability for the traffic control set up. ***Sidewalk fee in lieu has been paid. Receipt has been attached to the permit Once reactivated Customer is responsible for calling the final inspection. If final inspection fails Customer must apply for a revision and the revision will be followed by a full review process. 02/21/18 Changed GC To Michael and Mary Helen Fabacher. See attached transfer letter.**nmt Demo existing driveway approach on W. 9th Stl and close with 18 LF of new curb. Construct new sidewalk on W. 9th St. and 25 new driveway approach on Baylor St. Install 120 LF new Curb on Baylor St. Shall meet all city standards. See attached updated plan set.**nmt *12/12/16 See attached variance approved 12/06/16 for meandering sidewalk and non-standard slopes for driveway approach.**nmt *Partial Demolition. addition remodel of house garage new addition of a new wing new garage |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | January 26, 2015 |
| Issued | May 21, 2026 |
| Expires | May 29, 2026 |
| BBL | — |
| BIN | — |
Related searches