What was permitted
New driveway approaches, sidewalks, and curb and gutter are being constructed at this Austin location. The project includes two new driveway approaches totaling 55.8 feet, 215 linear feet of sidewalk, and 120 linear feet of curb and gutter.
This permit for new driveway and sidewalk construction was issued on June 16, 2026. The work is expected to involve phased closures for a total of two weeks. The contractor is listed as Unknown.