What was permitted
A new driveway approach and sidewalk are being constructed at 7124 Fayetteville Drive in Austin. The project includes a 17-foot driveway approach and a 28-foot section of sidewalk, contributing to property access and pedestrian safety.
This driveway and sidewalks permit is active and was issued on September 24, 2026. The general contractor for this new construction is Eva Mata. The estimated project cost is not specified in the permit details.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.