What was permitted
A permit for driveway and sidewalks work has been issued for 84 Chalmers Ave in Austin. The project involves the construction of a new driveway approach measuring 18 feet in length.
This permit was issued on July 21, 2026, and is currently active. The contractor for this work is currently listed as unknown.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in East cesar chavez, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-072638 DS |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Driveway / Sidewalks · New |
| Status | Final |
| Job description | Construct new driveway approach of 18 FT. I have begun reviewing your application request. For more information on our permit requirements visit: https://www.austintexas.gov/transportation-public-works/right-way-row-permits The items below MUST be provided before review can continue. Reply to this email once you have uploaded all required items to the ABC Portal. A response must be provided within 30 days or your request may be rejected due to inactivity. Additional comments may apply once the above has been confirmed. Plan Please provide a plan highlighting the sidewalk work scope. Traffic Control Plan The permit was issued with 804S2-Sheet 2. This will not work with in the 100 FT of the intersection. I can let you know more once you provide the plan. Additional comments may apply once the above has been confirmed. 8/12/26 Good afternoon 1. Let me know what Sam says if he ask you to add the sidewalk I can do form my end. 2. The permit was issued with 804 S2-Sheet which for a lane closure you can not use it with in the 100 ft of the intersection. only if- a. this closure is required to stage work equipments/ park work vehicle. b. If you can have the closure 100 ft away from the intersection. c. You can not close the alley entries. 3. Other recommendations are Standard Detail 804S-4 sheet 3 (top half) behind the curb closure ONLY; staging from private property and Special details 4 way flagger details. Let me know you thorughts. Sidewalk Condition This work will require a sidewalk closure. The standard 804S-1 sheet 4 (sidewalk closure) would NOT work because the detour route would be greater than 660 feet. Instead we could list a condition on our permit that you would be able to provide ADA accessibility the entire time. The condition would look like this Contractor MUST have crew present to halt work activities and escort pedestrians through or around the work area. Crew shall not impede travel lanes crosswalks alleyways fire hydrants or local access to all property. Please confirm this would be possible. |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | June 8, 2026 |
| Issued | July 21, 2026 |
| Expires | August 27, 2026 |
| BBL | — |