What was permitted
An electrical permit has been issued for the installation of a new solar and energy storage system at 12404 Bluestone Cir in Austin. This project involves adding 8.10 kW of solar power and a 16 kWh energy storage system to the existing residence.
The permit was issued on June 30, 2026, with a reported project cost of $2,800. Honest Solar is the electrical contractor responsible for this installation.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-065580 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Auxiliary Power |
| Status | Final |
| Job description | Install new 8.10 kW solar and 16 kWh energy storage system to existing residential only. Solar PV: 18 CW Energi CWT450-108TNB10 modules (450W each) 8.10 kW DC nameplate across two roof orientations (Azimuth 280 / Tilt 27 9 modules; Azimuth 100 / Tilt 26 9 modules). Roof-mounted on existing composition shingle roof. Inverter: 1 EG4 Electronics IV-16000-HYB-AW-FX (FlexBOSS21) hybrid inverter 16 kW AC continuous wall-mounted indoors. Energy Storage System: 1 EG4 WallMount 314 Ah / 16 kWh nameplate indoor-rated. PE-sealed plan set by Wyssling/McGuire H2DC PLLC (Texas PE). Master Electrician of Record: Patrick Baxter TECL #40995. AE Rebate Enrollment #1365173. DGPA executed. |
| Floor / unit | — |
| Estimated cost | $2,800 |
| Approved | May 22, 2026 |
| Issued | June 30, 2026 |
| Expires | September 14, 2026 |
| BBL | — |
| BIN | — |