Skip to content
ElectricalPermit issued

Solar System Installation at 1620 S IH 35 SVRD SB, Austin

1620 S IH 35 SVRD SB, 78704

Winston

Sinra's conciergeOnline now

Planning electrical work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

$277,104

As declared on the permit filing. Electrical Permit · Auxiliary Power.

Issued
September 18, 2026
Expires
February 21, 2027
License
Electrical Contractor

What was permitted

An electrical permit has been issued for a significant solar system installation at 1620 S IH 35 SVRD SB in Austin. This project includes 220 solar panels and four inverters, indicating a substantial renewable energy setup for an existing storage facility.

The permit is active and was issued on September 18, 2026, with an estimated project cost of $277,104. South Texas Solar Systems is listed as the electrical contractor for this large-scale solar project.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-109790 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Auxiliary Power
StatusActive
Job descriptionInstalling 121 KW Solar System with 220 ALEX-550-W panels and 4 SCA25KTL-DO to Existing Storage Facility
Floor / unit—
Estimated cost$277,104
ApprovedNovember 17, 2025
IssuedSeptember 18, 2026
ExpiresFebruary 21, 2027
BBL—
BIN—

Related searches

electrical permitsolar systemauxiliary powerAustinSouth Texas Solar Systems$277,104