Skip to content
ElectricalPermit issued

Solar & Energy Storage Installation at 4800 Mondonedo Cv, Austin

4800 MONDONEDO CV, 78738

Winston

Sinra's conciergeOnline now

Planning electrical work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

$67,370

As declared on the permit filing. Electrical Permit · Auxiliary Power.

Issued
September 22, 2026
Expires
April 5, 2027
License
Electrical Contractor

What was permitted

An electrical permit has been issued for the installation of a new roof-mounted solar system and energy storage system at 4800 Mondonedo Cv in Austin. This project aims to integrate renewable energy solutions with the existing single-family residence.

The permit, issued on September 22, 2026, is for an electrical 'Auxiliary Power' upgrade with a reported project cost of $67,370. Tesla Energy Operations, Inc. is the electrical contractor responsible for this installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-091674 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Auxiliary Power
StatusActive
Job descriptionInstall new roof-mounted solar system and energy storage system to existing single family residence. Underground AE
Floor / unit—
Estimated cost$67,370
ApprovedJuly 16, 2026
IssuedSeptember 22, 2026
ExpiresApril 5, 2027
BBL—
BIN—

Related searches

solar panel installationenergy storageelectrical permitAustin78738$67,370Tesla Energyrenewable energy