4907 TENISON CT, 78731
Homeowners in Austin considering renewable energy will be interested in this electrical permit for a substantial rooftop solar system. This project involves installing a new 23.925kW solar array on an existing residence, aiming to generate clean energy.
This permit was issued on July 28, 2026, with an reported project cost of $69,119. Freedom Solar Power is the electrical contractor responsible for this significant solar installation.
A 23.925kW rooftop solar system installation in Austin represents a significant investment in renewable energy, with costs often offset by long-term savings and incentives.
Issued
July 28, 2026
Expires
January 24, 2027
License
Electrical Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Freedom Solar Power
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-095422 EP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Electrical Permit · Auxiliary Power |
| Status | Active |
| Job Description | Install new 23.925kw rooftop solar system for existing residential only. |
| Floor / Unit | — |
| Estimated Cost | $69,119 |
| Approved | July 23, 2026 |
| Issued | July 28, 2026 |
| Expires |
| January 24, 2027 |
| BBL | — |
| BIN | — |