5916 CAPE CORAL DR, 78746
An electrical permit has been issued for the installation of a significant solar power system at 5916 Cape Coral Dr in Austin. This project includes a 24.92 kW roof-mounted solar array and two Tesla Powerwall 3 batteries.
This auxiliary power project is active and was issued on August 3, 2026, with a reported project cost of $130,511. Vitka Energy, an electrical contractor, is handling the installation.
Homeowners at 5916 Cape Coral Dr are investing $130,511 in a substantial solar and battery storage system, indicating a trend towards renewable energy solutions.
Issued
August 3, 2026
Expires
January 30, 2027
License
Electrical Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Vitka Energy
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-050871 EP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Electrical Permit · Auxiliary Power |
| Status | Active |
| Job Description | Installation of 24.92 kW roof mounted solar system and (2) Tesla Powerwall 3 Batteries |
| Floor / Unit | — |
| Estimated Cost | $130,511 |
| Approved | April 24, 2026 |
| Issued | August 3, 2026 |
| Expires |
| January 30, 2027 |
| BBL | — |
| BIN | — |