Skip to content
ElectricalPermit issued

Electrical Work at 5916 Cape Coral Dr, Austin

5916 CAPE CORAL DR, 78746

Winston

Sinra's conciergeOnline now

Planning electrical work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

$130,511

As declared on the permit filing. Electrical Permit · Auxiliary Power.

Issued
August 3, 2026
Expires
February 20, 2027
License
Electrical Contractor

What was permitted

An electrical permit has been issued for the installation of a significant solar power system at 5916 Cape Coral Dr in Austin. This project includes a 24.92 kW roof-mounted solar array and two Tesla Powerwall 3 batteries.

This auxiliary power project is active and was issued on August 3, 2026, with a reported project cost of $130,511. Vitka Energy, an electrical contractor, is handling the installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-050871 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Auxiliary Power
StatusActive
Job descriptionInstallation of 24.92 kW roof mounted solar system and (2) Tesla Powerwall 3 Batteries
Floor / unit—
Estimated cost$130,511
ApprovedApril 24, 2026
IssuedAugust 3, 2026
ExpiresFebruary 20, 2027
BBL—
BIN—

Related searches

solar panel installationTesla PowerwallAustinelectrical permitrenewable energy$130,511 cost