What was permitted
This electrical permit is for the installation of an energy storage system (ESS) integrated with an existing solar panel setup. The goal is to provide whole-home backup power for all customer loads.
Issued on November 13, 2026, this permit is active and has an estimated project cost of $16,500. ION Developer LLC is the electrical contractor responsible for this installation, which requires a meter pull for integration.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-048198 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Auxiliary Power |
| Status | Active |
| Job description | Installation of energy storage system into existing solar panel system. In order to interconnect the ESS equipment and perform a whole home backup for all customer loads we will need to schedule a Meter Pull so that the Backup Switch can be integrated to the existing utility meter. |
| Floor / unit | — |
| Estimated cost | $16,500 |
| Approved | April 20, 2026 |
| Issued | November 13, 2026 |
| Expires | May 12, 2027 |
| BBL | — |
| BIN | — |