What was permitted
This electrical permit is for the installation of a significant solar power and energy storage system at 6100 Cherrylawn Circle in Austin. The project includes a new 10.560kW DC and 11.4kW AC solar system, coupled with an 11.92kWh energy storage system.
The permit was issued on September 23, 2026, and is active. GM Electric is the electrical contractor responsible for this installation, which also involves a new AC disconnect for the solar and ESS. The project cost is not specified in this permit.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Pecan springs-springdale, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-049919 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Auxiliary Power |
| Status | Active |
| Job description | Installation new 10.560kw DC and 11.4kw AC solar system with new 11.92kwh energy storage system . installation new AC Disconnect for Solar and ESS system. |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | April 22, 2026 |
| Issued | September 23, 2026 |
| Expires | March 29, 2027 |
| BBL | — |
| BIN | — |
Related searches