Skip to content
ElectricalWindsor parkPermit issued

Solar Panel Installation at 6111 E US 290 HWY SVRD EB, Austin

6111 E US 290 HWY SVRD EB, Windsor park, 78723

Winston

Sinra's conciergeOnline now

Planning electrical work near Windsor park? I’ll scope it, price it, and line up the right pro.

Reported project cost

$40,000

As declared on the permit filing. Electrical Permit · Auxiliary Power.

Issued
October 6, 2026
Expires
April 5, 2027
License
Electrical Contractor

What was permitted

An electrical permit has been issued for the installation of a significant new rooftop solar photovoltaic (PV) system at 6111 E US 290 HWY SVRD EB in Austin. This system is designed to generate 44.625 kW DC and will be interconnected with the existing electrical service.

The permit is active and was issued on October 6, 2026, with an estimated project cost of $40,000. Harvest Solar Inc is the electrical contractor responsible for this installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Windsor park, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-116479 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Auxiliary Power
StatusActive
Job descriptionInstallation of a new roof top solar PV system 44.625 Kw DC and interconnection to the existing service
Floor / unit—
Estimated cost$40,000
ApprovedSeptember 1, 2026
IssuedOctober 6, 2026
ExpiresApril 5, 2027
BBL—
BIN—

Related searches

solar PVelectrical permitAustinrenewable energy$40,000