Skip to content
ElectricalPermit issued

Solar Panel Installation at 7300 ANAQUA DR, Austin

7300 ANAQUA DR, 78750

Winston

Sinra's conciergeOnline now

Planning electrical work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

$5,000

As declared on the permit filing. Electrical Permit · Auxiliary Power.

Issued
September 9, 2026
Expires
September 9, 2026
License
Electrical Contractor

What was permitted

This project involves adding 10 Mission Solar Energy panels and a Tesla inverter/battery to an existing solar photovoltaic system. The new installation will bring the total system size to 4.35 kW.

The electrical permit for this auxiliary power project was finalized on September 9, 2026, with a reported project cost of $5,000. Good Faith Energy is the electrical contractor.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-011851 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Auxiliary Power
StatusFinal
Job description**Adding (10) Mission Solar Energy LLC MSX10-435HN0B solar panels. In total will be installing a 4.35 kW PV system and (1) TESLA INC. 1807000-XX-Y. The customer has an existing system that consists of (18) MISSION SOLAR ENERGY LLC MSX10-435HN0B panels and (1) TESLA INC. 1707000-XX-Y inverter/battery.
Floor / unit—
Estimated cost$5,000
ApprovedJanuary 30, 2026
IssuedSeptember 9, 2026
ExpiresSeptember 9, 2026
BBL—
BIN—

Related searches

solar panelsPV systemTesla batteryAustinelectrical permitauxiliary powerGood Faith Energy