ElectricalPermit issued

Large Solar System Installation at 9215 S 1st St, Austin

9215 S 1ST ST, 78748

Winston

Sinra's conciergeOnline now

Planning electrical work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

$61,848

As declared on the permit filing. Electrical Permit · Auxiliary Power.

Issued
July 7, 2026
Expires
January 25, 2027
License
Electrical Contractor

What was permitted

A substantial 95.15kW solar system is being installed at 9215 S 1st St, utilizing 173 solar panels and three inverters for an existing storage facility. This is a significant electrical project.

This electrical permit was issued on July 7, 2026, and is active. South Texas Solar Systems is the contractor for this large-scale solar installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-069699 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Auxiliary Power
StatusActive
Job descriptionInstalling 95.15kW solar system with 173 ALEX-550-W-144-S solar panels and 3 SCA25K for Existing Storage Facility
Floor / unit—
Estimated cost$61,848
ApprovedNovember 4, 2025
IssuedJuly 7, 2026
ExpiresJanuary 25, 2027
BBL—
BIN—