Airport Infrastructure Upgrade at 3600 Presidential Blvd, Austin
3600 PRESIDENTIAL BLVD, 78719
What was permitted
A significant electrical and mechanical project is underway at 3600 Presidential Blvd, within the Austin-Bergstrom International Airport. This involves constructing structural towers and installing new conduits and circuits to support a Virtual Ramp Control System, including camera housing and compressor systems.
This electrical permit is active and was issued on June 16, 2026, with an estimated project cost of $950,000. Prism Electric Inc is the electrical contractor for this extensive infrastructure work.
This large-scale electrical and mechanical project at the airport, costing $950,000, highlights significant infrastructure investment for enhanced security and operational control.
What it cost
Issued
June 16, 2026
Expires
December 13, 2026
License
Electrical Contractor
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Prism Electric Inc
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-066212 EP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Electrical Permit · Remodel |
| Status | Active |
| Job Description | Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits] |
| Floor / Unit | — |
| Estimated Cost | $950,000 |
| Approved | March 30, 2026 |
| Issued | June 16, 2026 |
| Expires | December 13, 2026 |
| BBL | — |