10748 BRAMBLECREST DR, 78726
A new 50A GFCI circuit is being installed to support an electric vehicle (EV) charger at 10748 Bramblecrest Dr in Austin. This involves routing wiring from the main panel to the garage interior.
This electrical permit was issued on August 5, 2026, and is active. The estimated project cost for this EV charger circuit installation is $2,500, with Supersun Electrical Services as the contractor.
Homeowners in the 78726 zip code looking to install an EV charger can reference this project's estimated cost of $2,500 for a 50A circuit.
Issued
August 5, 2026
Expires
February 1, 2027
License
Electrical Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Supersun Electrical Services
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-100420 EP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Electrical Permit · Repair |
| Status | Active |
| Job Description | We will install a new 50A GFCI circuit in the 200A MSP. We will route the wiring directly behind the main panel through a surface-mounted conduit to the back interior garage wall and install the NEMA 14-50 in an Indoor-Rated NEMA Receptacle Cover and Box. The charger will be installed on a 50A circuit and will draw up to 40A continuous. |
| Floor / Unit | — |
| Estimated Cost | $2,500 |
| Approved | August 3, 2026 |
| Issued |
| August 5, 2026 |
| Expires | February 1, 2027 |
| BBL | — |
| BIN | — |