ElectricalPermit issued

Electrical Work for EV Charger at 10748 Bramblecrest Dr, Austin

10748 BRAMBLECREST DR, 78726

Winston

Sinra's conciergeOnline now

Planning electrical work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

$2,500

As declared on the permit filing. Electrical Permit · Repair.

Issued
August 5, 2026
Expires
August 14, 2026
License
Electrical Contractor

What was permitted

A new 50A GFCI circuit is being installed to support an electric vehicle (EV) charger at 10748 Bramblecrest Dr in Austin. This involves routing wiring from the main panel to the garage interior.

This electrical permit was issued on August 5, 2026, and is active. The estimated project cost for this EV charger circuit installation is $2,500, with Supersun Electrical Services as the contractor.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-100420 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Repair
StatusFinal
Job descriptionWe will install a new 50A GFCI circuit in the 200A MSP. We will route the wiring directly behind the main panel through a surface-mounted conduit to the back interior garage wall and install the NEMA 14-50 in an Indoor-Rated NEMA Receptacle Cover and Box. The charger will be installed on a 50A circuit and will draw up to 40A continuous.
Floor / unit—
Estimated cost$2,500
ApprovedAugust 3, 2026
IssuedAugust 5, 2026
ExpiresAugust 14, 2026
BBL—
BIN—