What was permitted
A new 50A GFCI circuit is being installed to support an electric vehicle (EV) charger at 10748 Bramblecrest Dr in Austin. This involves routing wiring from the main panel to the garage interior.
This electrical permit was issued on August 5, 2026, and is active. The estimated project cost for this EV charger circuit installation is $2,500, with Supersun Electrical Services as the contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-100420 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Repair |
| Status | Final |
| Job description | We will install a new 50A GFCI circuit in the 200A MSP. We will route the wiring directly behind the main panel through a surface-mounted conduit to the back interior garage wall and install the NEMA 14-50 in an Indoor-Rated NEMA Receptacle Cover and Box. The charger will be installed on a 50A circuit and will draw up to 40A continuous. |
| Floor / unit | — |
| Estimated cost | $2,500 |
| Approved | August 3, 2026 |
| Issued | August 5, 2026 |
| Expires | August 14, 2026 |
| BBL | — |
| BIN | — |