17221 ASTRAL LN, 78653
An electrical repair and upgrade is taking place at 17221 Astral Ln in Austin, focusing on enhancing a residential solar power system. The project involves adding a 11.5KW Tesla Powerwall 3 to the existing 5.67 kwdc solar setup.
This electrical permit is active and was issued on July 6, 2026, with an estimated project cost of $1,000. Alba Energy LLC is the contractor responsible for this energy storage system installation.
Homeowners in the 78653 area considering solar or battery storage can note the $1,000 project cost for a Tesla Powerwall 3 upgrade, as managed by Alba Energy LLC.
Issued
July 6, 2026
Expires
January 2, 2027
License
Electrical Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Alba Energy LLC
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-081039 EP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Electrical Permit · Repair |
| Status | Active |
| Job Description | Upgrade existing 5.67 kwdc solar system to 5.67 kwdc solar system with a 11.5KW Tesla Powerwall 3 ESS. |
| Floor / Unit | — |
| Estimated Cost | $1,000 |
| Approved | June 24, 2026 |
| Issued | July 6, 2026 |
| Expires |
| January 2, 2027 |
| BBL | — |
| BIN | — |
Browse More