What was permitted
Homeowners interested in electric vehicle charging solutions can look at this permit for cost indications. This project involves installing a Level 2 EV charger at the front house, powered by a 50A breaker from an existing subpanel.
This electrical repair permit was issued on October 1, 2026, and is active. The estimated project cost for this EV charger installation is $2,583, with Charge Pro LLC handling the work.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in North loop, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-127621 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Repair |
| Status | Final |
| Job description | Install Level 2 EV Charger at front house of property (the pink house). Charger to be powered by 50A breaker placed in existing 100A subpanel located inside the front house. Conduit and wire to exit interior subpanel and run into/through short trench (est. 10 feet) around front doorway then run low along foundation towards driveway. Charger to be mounted on the exterior left wall of the garage. |
| Floor / unit | — |
| Estimated cost | $2,583 |
| Approved | September 28, 2026 |
| Issued | October 1, 2026 |
| Expires | October 7, 2026 |
| BBL | — |
| BIN | — |
Related searches