What was permitted
An electrical permit was issued for an EV charger installation at 3401 Winfield Drive in Austin. This project involves repurposing an existing circuit in the main panel to power a ribbon wall charger, configured to draw up to 32 amps.
The permit is active and was issued on August 26, 2026, with an estimated project cost of $900. This cost reflects the electrical work required to safely and efficiently install an electric vehicle charging station.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in South lamar, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-108144 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Repair |
| Status | Active |
| Job description | EV charger installation: Repurpose the existing 40 circuit in the main panel hard wire the ribbon wall charger and configure to draw up to 32 amps continuous |
| Floor / unit | — |
| Estimated cost | $900 |
| Approved | August 18, 2026 |
| Issued | August 26, 2026 |
| Expires | March 22, 2027 |
| BBL | — |
| BIN | — |
Related searches