517 S PLEASANT VALLEY RD, 78741
This electrical permit details work for a water quality control pond pump at Krieg Field, a municipal project. The scope includes installing conduit, a transformer, and new circuits to power the pump, with considerations for voltage drop due to the distance.
Issued on June 22, 2026, this permit is active and has an estimated project cost of $5,000. J.S. Electric, Inc. is the electrical contractor responsible for this specialized installation.
An electrical project to power a water quality control pond pump at Krieg Field in Austin 78741 has an estimated cost of $5,000.
Issued
June 22, 2026
Expires
December 19, 2026
License
Electrical Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by J.S. Electric, Inc.
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-074050 EP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Electrical Permit · Repair |
| Status | Active |
| Job Description | Electrical connection to existing water quality control pond pump at Krieg Field (City of Austin Parks and Recreation). Install approximately 345 linear feet of electrical conduit from an existing panel to the existing pump electrical connection point. Install one 15-amp 480-volt 1-phase circuit from existing 480-volt panel to a location near the pump controller. At the pump controller location install one rack-mounted 7kVA 480-120/240-volt transformer with service disconnects for line and load connections. Terminate new low-voltage circuit to the pump controller. Underground feeder routed in 2 Schedule 80 PVC from the 480-volt panel to the transformer with two in-ground Quazite boxes with lids. Conductor size increased based on limiting voltage drop due to length. Pump controller and alarm system provided by others and existing. Trenching provided by City of Austin Parks and Recreation. |
| Floor / Unit | — |
| Estimated Cost | $5,000 |
| Approved | June 10, 2026 |
| Issued | June 22, 2026 |
| Expires | December 19, 2026 |
| BBL | — |
| BIN | — |