What was permitted
An electrical repair project is underway at 6704 Back Bay Ln in Austin, focusing on the installation of a Level 2 Electric Vehicle (EV) charger. This involves setting up a 60-amp circuit breaker and running appropriate wiring within conduit.
This electrical permit is active and was issued on July 22, 2026, with a reported project cost of $644. The contractor responsible for this EV charger installation is Faraday Electric.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-093565 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Repair |
| Status | Final |
| Job description | Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. + #10 THHN c.u. ground <5ft 3/4 EMT conduit to power the Level 2 EV Charger at 48amp constant draw. |
| Floor / unit | — |
| Estimated cost | $644 |
| Approved | July 20, 2026 |
| Issued | July 22, 2026 |
| Expires | September 14, 2026 |
| BBL | — |
| BIN | — |