ElectricalPermit issued

EV Charger Electrical Work at 6704 Back Bay Ln, Austin

6704 BACK BAY LN, 78739

Winston

Sinra's conciergeOnline now

Planning electrical work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

$644

As declared on the permit filing. Electrical Permit · Repair.

Issued
July 22, 2026
Expires
September 14, 2026
License
Electrical Contractor

What was permitted

An electrical repair project is underway at 6704 Back Bay Ln in Austin, focusing on the installation of a Level 2 Electric Vehicle (EV) charger. This involves setting up a 60-amp circuit breaker and running appropriate wiring within conduit.

This electrical permit is active and was issued on July 22, 2026, with a reported project cost of $644. The contractor responsible for this EV charger installation is Faraday Electric.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-093565 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Repair
StatusFinal
Job descriptionLevel 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. + #10 THHN c.u. ground <5ft 3/4 EMT conduit to power the Level 2 EV Charger at 48amp constant draw.
Floor / unit—
Estimated cost$644
ApprovedJuly 20, 2026
IssuedJuly 22, 2026
ExpiresSeptember 14, 2026
BBL—