What was permitted
An electrical repair and upgrade project is underway at the Butterfly Bridge, located at 710 W Cesar Chavez St. This work involves replacing 16 existing spotlight fixtures with new LED luminaires, including updated power and data cables.
The permit for this electrical work was issued on September 17, 2026, with an estimated project cost of $10,000. Elk Electric, Inc. is the electrical contractor responsible for this fixture replacement.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Downtown, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-120268 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Repair |
| Status | Final |
| Job description | Spot light fixture replacement/upgrade at the Butterfly Bridge. Existing fixtures to be demod along with power conductors and data cables up to bridge interior junction box relocating the service point for easier access. New LED luminaires to be installed with fixed manufacturer power and data cables. Existing fixture mounts raceways and branch lighting circuits to be reused. 16 Lights total Replacement of the existing fixtures |
| Floor / unit | — |
| Estimated cost | $10,000 |
| Approved | September 14, 2026 |
| Issued | September 17, 2026 |
| Expires | September 18, 2026 |
| BBL | — |
| BIN | — |
Related searches