7229 SPOTTED LEAF WAY, 78617
A homeowner at Spotted Leaf Way in De Valle is installing a Level 2 electric vehicle charging station. This electrical permit covers the addition of a dedicated circuit and connector to support faster EV charging within the garage.
This electrical permit for an EV charger was issued on June 8, 2026, and is active. Blue Paw Energy Service, LLC is the electrical contractor handling the installation.
Homeowners installing EV chargers should budget for electrical work, which can involve adding breakers and wiring to support the charging station.
Issued
June 8, 2026
Expires
December 7, 2026
License
Electrical Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Blue Paw Energy Service, LLC
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-066257 EP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Electrical Permit · Repair |
| Status | Active |
| Job Description | A stand-alone electrical permit to install level 2 charging station to property at 77229 Spotted Leaf Way De Valle 78617. The property already has a pre-wired 50-amp 240 system for EV charging system with 100-amp subpanel inside garage fed from a 50-amp breaker at main breaker panel. The work will consist of adding a 50-amp 240v GFCI breaker with raceway with #6 ungrounded conductors to a Tesla Level 2 Wall Connector next to the subpanel inside the garage. |
| Floor / Unit | — |
| Estimated Cost | Not reported |
| Approved |
| May 26, 2026 |
| Issued | June 8, 2026 |
| Expires | December 7, 2026 |
| BBL | — |
| BIN | — |