Skip to content
ElectricalPermit issued

Electrical Work for EV Charger at 7229 Spotted Leaf Way, De Valle

7229 SPOTTED LEAF WAY, 78617

Winston

Sinra's conciergeOnline now

Planning electrical work in Austin? I’ll scope it, price it, and line up the right pro.

Reported project cost

Not reported

The filer did not disclose a cost on this permit. Electrical Permit · Repair.

Issued
June 8, 2026
Expires
June 11, 2026
License
Electrical Contractor

What was permitted

A homeowner at Spotted Leaf Way in De Valle is installing a Level 2 electric vehicle charging station. This electrical permit covers the addition of a dedicated circuit and connector to support faster EV charging within the garage.

This electrical permit for an EV charger was issued on June 8, 2026, and is active. Blue Paw Energy Service, LLC is the electrical contractor handling the installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-066257 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Repair
StatusFinal
Job descriptionA stand-alone electrical permit to install level 2 charging station to property at 77229 Spotted Leaf Way De Valle 78617. The property already has a pre-wired 50-amp 240 system for EV charging system with 100-amp subpanel inside garage fed from a 50-amp breaker at main breaker panel. The work will consist of adding a 50-amp 240v GFCI breaker with raceway with #6 ungrounded conductors to a Tesla Level 2 Wall Connector next to the subpanel inside the garage.
Floor / unit—
Estimated costNot reported
ApprovedMay 26, 2026
IssuedJune 8, 2026
ExpiresJune 11, 2026
BBL—
BIN—

Related searches

EV charger installationlevel 2 chargerelectrical permitDe Valle TXBlue Paw Energy Service