8101 VERBANK VILLA DR, 78747
This electrical permit is for the installation of a new electric vehicle (EV) charger at a residence in Austin. The project involves adding a 60-amp circuit to the main electrical panel and routing wiring to the garage.
The permit was issued on July 18, 2026, with an estimated project cost of $901. Mcleod Electric, an electrical contractor, is performing the installation of the Chargepoint Home Flex charger.
Residents in Austin can see an EV charger installation project at 8101 Verbank Villa Dr, with an estimated cost of $901, indicating the growing trend of home EV infrastructure.
Issued
July 18, 2026
Expires
January 14, 2027
License
Electrical Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Mcleod Electric
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-091721 EP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Electrical Permit · Repair |
| Status | Active |
| Job Description | PV charger installation: Proposed installation is installing a new 60-amp circuit in the 200-amp MSP and route wiring directly behind and to the right interior garage wall... hard wire the Chargepoint Home Flex- J1772 and configure to draw up to 48 A continuous. |
| Floor / Unit | — |
| Estimated Cost | $901 |
| Approved | July 16, 2026 |
| Issued |
| July 18, 2026 |
| Expires | January 14, 2027 |
| BBL | — |
| BIN | — |
Browse More