Skip to content
ElectricalBrentwoodPermit issued

EV Charging Station Electrical Work at 1717 Justin Ln, Austin

1717 JUSTIN LN, Brentwood, 78757

Winston

Sinra's conciergeOnline now

Planning electrical work near Brentwood? I’ll scope it, price it, and line up the right pro.

Reported project cost

Not reported

The filer did not disclose a cost on this permit. Electrical Permit · Special Inspections Program.

Issued
September 8, 2026
Expires
March 7, 2027
License
Electrical Contractor

What was permitted

An electrical permit has been issued for the installation of a circuit to power an electric vehicle charging station at 1717 Justin Lane. This indicates a homeowner is preparing to install EV charging infrastructure.

The permit was issued on September 8, 2026, and is part of the Special Inspections Program. SMART CHARGE RESIDENTAL LLC is the electrical contractor responsible for this installation. The cost for installing an EV charger can range depending on the complexity of the electrical work required.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Brentwood, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number2026-114099 EP
Work permit #—
Job filing number—
Work typeElectrical Permit · Special Inspections Program
StatusFinal
Job description(Sharetts Andrew) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Floor / unit—
Estimated costNot reported
ApprovedAugust 31, 2026
IssuedSeptember 8, 2026
ExpiresMarch 7, 2027
BBL—
BIN—

Related searches

electrical permitEV chargerelectric vehicleAustinresidentialSMART CHARGE RESIDENTAL LLCspecial inspections