What was permitted
An electrical upgrade is underway at 5702 Wagon Train Rd in Austin, involving a temporary disconnect to boost service to 200A. This includes a new meter can and main electric panel.
The project, issued on September 21, 2026, also adds two new heat pump circuits and a 60A EV charger circuit, powered from the new panel. The estimated project cost is $11,050, with Charge Pro LLC as the electrical contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-120929 EP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Permit · Upgrade |
| Status | Active |
| Job description | Temporary disconnect require to upgrade service to 200A. Includes new 200A meter can and new main electric panel with 200A main breaker. We are also adding (2) new heat pump circuits (one for the upstairs and one for the downstairs) and (1) new 60A EV charger circuit to all be powered from the new main electric panel. EV charger to be installed in attached garage and installed according to Austin Energys Plugin Rebate Guidelines. |
| Floor / unit | — |
| Estimated cost | $11,050 |
| Approved | September 15, 2026 |
| Issued | September 21, 2026 |
| Expires | April 4, 2027 |
| BBL | — |
| BIN | — |
Related searches