What was permitted
Homeowners in Chicago's West Ridge neighborhood can see the details of a significant electrical upgrade project. This work involves installing a new permanent 160-amp service disconnect with multiple circuits, along with a 13.5 kWh lithium-ion energy storage system, located on the side of the home.
This project, with an reported cost of $27,500, was issued on September 14, 2026, and is currently active. The work is being handled by KENNETH STEINBERG.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in West Ridge, and lines up the right contractor. You approve; we handle the back-and-forth.