What was permitted
For residents in East Garfield Park looking to upgrade their electrical systems or add EV charging, this permit provides a cost reference. The work includes adding two circuits to an existing 200 AMP service and installing one electric vehicle supply equipment space.
This electrical work permit was issued on September 22, 2026, and is active. While the permit fee was $150, the estimated project cost for adding circuits and EV charging equipment would vary based on the specific installation details.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in East Garfield Park, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200512727 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Work |
| Status | ACTIVE |
| Job description | LINE VOLTAGE ELECTRICAL WORK. ADD 2 CIRCUITS TO EXISTING 200 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. ELECTRIC VEHICLE SUPPLY EQUIPMENT:1 SPACES. SPECIFIC LOCATION: GARAGE. |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | September 22, 2026 |
| Issued | September 22, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Lakin Todd
Related searches