What was permitted
Homeowners in Dunning interested in electrical upgrades or renewable energy solutions can look at this permit. The project includes a new permanent 125-amp service disconnect with one circuit, along with a 13.5 kWh lithium-ion energy storage system.
This electrical work permit was issued on July 30, 2026, with an estimated project cost of $16,560. HARDWIRRE SYSTEMS LLC is the contractor managing this installation, which includes a new meter service.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Dunning, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200480633 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Work |
| Status | ACTIVE |
| Job description | LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 125 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. 13.5 KWH LITHIUM ION ENERGY STORAGE SYSTEM. SPECIFIC LOCATION: METER. |
| Floor / unit | — |
| Estimated cost | $16,560 |
| Approved | July 29, 2026 |
| Issued | July 30, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Arellano Bernice
Related searches