What was permitted
This permit covers line voltage electrical work, including the installation of a new permanent 100 AMP service disconnecting means with one circuit. Additionally, a 13.5 KWH lithium-ion energy storage system is being installed on the exterior wall near the main panel.
The permit is currently active and was issued on May 27, 2026. The reported project cost for this electrical upgrade is $5,000, with SUNRUN INSTALLATION SERVICES INC listed as the contact.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Brighton Park, and lines up the right contractor. You approve; we handle the back-and-forth.