What was permitted
For residents in the New City area, this permit provides insight into the cost of line voltage electrical work, specifically the installation of a new permanent 125 AMP service disconnecting means. This is essential for managing a home's power supply.
The permit was issued on September 17, 2026, with a reported project cost of $2,300. SUNRUN INSTALLATION SERVICES INC is the contractor for this electrical upgrade.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in New City, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200512159 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Work |
| Status | ACTIVE |
| Job description | LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 125 AMP SERVICE DISCONNECTING MEANS WITH 1 CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: METER, EXTERIOR, SERVICE FEEDER, SERVICE CONDUCTOR. |
| Floor / unit | — |
| Estimated cost | $2,300 |
| Approved | September 17, 2026 |
| Issued | September 17, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Williiams Stephen
Related searches