What was permitted
This permit is for line voltage electrical work, specifically adding one circuit to an existing 200-amp service disconnect. The project also includes the installation of one electric vehicle supply equipment space.
The permit is active and was issued on October 15, 2026, with a reported project cost of $2,500. MIK SOLUTIONS INCORPORATED is the contact for this electrical work.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Edgewater, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200516094 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Electrical Work |
| Status | ACTIVE |
| Job description | LINE VOLTAGE ELECTRICAL WORK. ADD 1 CIRCUITS TO EXISTING 200 AMP SERVICE DISCONNECTING MEANS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. ELECTRIC VEHICLE SUPPLY EQUIPMENT:1 SPACES. SPECIFIC LOCATION: BASEMENT, OUTSIDE. |
| Floor / unit | — |
| Estimated cost | $2,500 |
| Approved | October 15, 2026 |
| Issued | October 15, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Dubroc Brandon
Related searches