Skip to content
General ConstructionManhattanPermit issued

Interior Partition Installation & Use Change at 50 Hudson Yards, Chelsea-Hudson Yards

50 HUDSON YARDS, Manhattan, 10001 · Chelsea-Hudson Yards

Winston

Sinra's conciergeOnline now

Planning general construction work near Chelsea-Hudson Yards? I’ll scope it, price it, and line up the right pro.

Reported project cost

$12,539,924

As declared on the permit filing. General Construction.

Issued
June 23, 2026
Expires
December 31, 2026
License
General Contractor

What was permitted

This general construction permit at 50 Hudson Yards in Manhattan involves installing non-load-bearing partitions and a change of use, egress, and occupancy on several floors. This indicates a significant reconfiguration of interior spaces within a major commercial building.

The project, with an estimated cost of $12,539,924, was issued a permit on June 23, 2026, and is being handled by STRUCTURE TONE, LLC. This type of work is typical for tenant fit-outs in large office buildings.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number166743182
Work permit #M01358403-I1-GC
Job filing number—
Work typeGeneral Construction
StatusPermit Issued
Job descriptionINSTALLATION OF NON-LOAD-BEARING PARTITIONS AS PER PLANS. CHANGE OF USE, EGRESS, AND OCCUPANCY ON L50 (CONSTRUCTION 30)CONSTRUCTION FLOORS 30, 33 & 34 (TENANT LEVELS 50, 53 & 54).
Floor / unitFloor Number(s) 30 through 30, Floor Number(s) 33 through 33, Floor Number(s) 34 through 34
Estimated cost$12,539,924
ApprovedMarch 17, 2026
IssuedJune 23, 2026
ExpiresDecember 31, 2026
BBL—
BIN—

Property owner

50 Hymc Owner LLC

Andrew Cantor

Related searches

general constructionchelsea-hudson yardsmanhattaninterior partitionschange of use$12M-$13M