Skip to content
General ConstructionManhattanPermit issued

General Construction at 60 Central Park West, Manhattan

60 CENTRAL PARK WEST, Manhattan, 10023 · Upper West Side-Lincoln Square

Winston

Sinra's conciergeOnline now

Planning general construction work near Upper West Side-Lincoln Square? I’ll scope it, price it, and line up the right pro.

Reported project cost

$50,000

As declared on the permit filing. General Construction.

Issued
October 21, 2026
Expires
May 5, 2027
License
General Contractor

What was permitted

This permit is for the installation of a temporary pedestrian scaffold bridge at 60 Central Park West in Manhattan's Upper West Side-Lincoln Square neighborhood. The structure is specifically for the Annual NYC Marathon and will not alter existing structures.

The project cost is estimated at $50,000, and the permit was issued on October 21, 2026. NEW YORK ROAD RUNNERS INC. is the General Contractor responsible for site safety and the removal of all equipment after the event.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number957507380
Work permit #M01472614-I1-GC
Job filing number—
Work typeGeneral Construction
StatusPermit Issued
Job descriptionInstall of temporary pedestrian scaffold bridge, no alt to exist structures for Annual NYC Marathon. TPA not required. Producer is responsible to monitor site safety & implement HWAP. All prod equip removed upon event complete
Floor / unitOpen Space
Estimated cost$50,000
ApprovedOctober 20, 2026
IssuedOctober 21, 2026
ExpiresMay 5, 2027
BBL—
BIN—

Property owner

NYC Parks

Anne McTernan

Related searches

General ConstructionUpper West Side-Lincoln SquareManhattanNew York CityTemporary StructureEvent Infrastructure$50,000 Project Cost