Skip to content
General ConstructionManhattanPermit issued

General Construction at 717 Fifth Avenue, Manhattan

717 FIFTH AVENUE, Manhattan, 10022 · Midtown-Times Square

Winston

Sinra's conciergeOnline now

Planning general construction work near Midtown-Times Square? I’ll scope it, price it, and line up the right pro.

Reported project cost

$2,499,276

As declared on the permit filing. General Construction.

Issued
July 17, 2026
Expires
June 29, 2027
License
General Contractor

What was permitted

A significant general construction project is underway at 717 Fifth Avenue in the bustling Midtown-Times Square neighborhood of Manhattan. This permit covers the interior demolition of a retail space, spanning from the cellar up to the third floor.

The demolition scope is extensive, including partitions, ceilings, restrooms, convenience stairs, two elevators, and dumbwaiters, with plans to rebuild the lower second-floor slab. Issued on July 17, 2026, the estimated project cost is $2,499,276, handled by SCHIMENTI CONSTRUCTION CO.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number421730303
Work permit #M01201119-I1-GC
Job filing number—
Work typeGeneral Construction
StatusPermit Issued
Job descriptionINTERIOR DEMOLITION OF EXISTING RETAIL SPACE, CELLAR THRU THIRD FLOOR. DEMOLITION TO INCLUDE PARTITIONS, CEILINGS, RESTROOMS, CONVENIENCE STAIRS, TWO ELEVATORS, AND DUMBWAITERS. DEMOLITION OF LOWER SECOND FLOOR SLAB, TO BE REBUILT TO ALIGN WITH THE 2ND FL
Floor / unitCellar, Floor Number(s) 001 through 003
Estimated cost$2,499,276
ApprovedMay 7, 2025
IssuedJuly 17, 2026
ExpiresJune 29, 2027
BBL—
BIN—

Property owner

Cbre, INC.

Sarah Lewis

Related searches

general constructionMidtown-Times SquareManhattanNew York Cityinterior demolitionretail renovation$2.4M+