General ConstructionStaten islandPermit issued

Water Main Loop Construction at 751 Mill Road, Staten Island

751 MILL ROAD, Staten island, 10306 · Oakwood-Richmondtown

Winston

Sinra's conciergeOnline now

Planning general construction work near Oakwood-Richmondtown? I’ll scope it, price it, and line up the right pro.

Reported project cost

$5,484,797

As declared on the permit filing. General Construction.

Issued
April 2, 2026
Expires
March 26, 2027
License
General Contractor

What was permitted

Residents in the Oakwood-Richmondtown area of Staten Island might observe extensive general construction at 751 Mill Road. This project involves the installation of a water main loop throughout the site, connecting to RPZ chambers and a dewatering building.

The permit for this substantial infrastructure project was issued on April 2, 2026, with an estimated cost of $5,484,797. STRATIS CONTRACTING CORP is the general contractor managing this work.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Staten island, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number707641581
Work permit #S00870290-I1-EA
Job filing number—
Work typeGeneral Construction
StatusPermit Issued
Job descriptionConstruction of Water Main Loop throughout the site, connecting at two RPZ chambers and at the Dewatering Building and Installation of new Stainless Steel grating over the Chlorine Contact Tanks.
Floor / unitFloor Number(s) 1 through 1
Estimated cost$5,484,797
ApprovedMay 12, 2023
IssuedApril 2, 2026
ExpiresMarch 26, 2027
BBL—
BIN—

Property owner

NYC Dep

Kevin Clarke