What was permitted
Residents near St. John Cemetery in Queens may be interested in the significant HVAC upgrade at 80-01 Metropolitan Avenue. This project involves replacing the existing cooling tower and chillers with a new air-cooled system.
The permit for this General Construction work was issued on May 12, 2026, with a substantial estimated project cost of $600,000. TRADITIONAL AIR COND* INC is the General Contractor overseeing this large-scale AC system replacement.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Queens, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 162542780 |
|---|---|
| Work permit # | Q01359595-I1-GC-CX |
| Job filing number | — |
| Work type | General Construction |
| Status | Permit Issued |
| Job description | Replacing the AC system at Resurrection Mausoleum ,St. John Cemetery. Removal of the cooling tower, removal of (2) water cooled chillers and associated pumps, electrical and controls. New air-cooled chiller system to be installed in the existing areaway. |
| Floor / unit | Basement/Sub-basement, Basement/Sub-basement |
| Estimated cost | $600,000 |
| Approved | May 8, 2026 |
| Issued | May 12, 2026 |
| Expires | January 1, 2027 |
| BBL | — |
| BIN | — |
Property owner
Catholic Cemeteries Diocese Of Broo
Michael Inserra
Related searches