Skip to content
General ConstructionQueensPermit issued

AC System Replacement at 80-01 Metropolitan Avenue, Queens

80-01 METROPOLITAN AVENUE, Queens, 11379 · St. John Cemetery

Winston

Sinra's conciergeOnline now

Planning general construction work near St. John Cemetery? I’ll scope it, price it, and line up the right pro.

Reported project cost

$600,000

As declared on the permit filing. General Construction.

Issued
May 12, 2026
Expires
January 1, 2027
License
General Contractor

What was permitted

Residents near St. John Cemetery in Queens may be interested in the significant HVAC upgrade at 80-01 Metropolitan Avenue. This project involves replacing the existing cooling tower and chillers with a new air-cooled system.

The permit for this General Construction work was issued on May 12, 2026, with a substantial estimated project cost of $600,000. TRADITIONAL AIR COND* INC is the General Contractor overseeing this large-scale AC system replacement.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Queens, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number162542780
Work permit #Q01359595-I1-GC-CX
Job filing number—
Work typeGeneral Construction
StatusPermit Issued
Job descriptionReplacing the AC system at Resurrection Mausoleum ,St. John Cemetery. Removal of the cooling tower, removal of (2) water cooled chillers and associated pumps, electrical and controls. New air-cooled chiller system to be installed in the existing areaway.
Floor / unitBasement/Sub-basement, Basement/Sub-basement
Estimated cost$600,000
ApprovedMay 8, 2026
IssuedMay 12, 2026
ExpiresJanuary 1, 2027
BBL—
BIN—

Property owner

Catholic Cemeteries Diocese Of Broo

Michael Inserra

Related searches

AC replacementHVAC upgradecooling towerchiller systemSt. John CemeteryQueenspermit issuedconstruction cost