800 FOOD CENTER DRIVE, BRONX, 10474 · Hunts Point
A permit has been issued for the installation of temporary structures for an outdoor concert at 800 Food Center Drive in the Bronx. These structures will be removed after the event concludes, with no impact on existing building use or egress.
This general construction project, with an estimated cost of $25,000, was issued on May 20, 2026. TCE PRESENTS LLC is the contractor for these temporary concert structures.
Homeowners near Hunts Point can see that temporary event structures, like those for concerts, have an estimated project cost of $25,000 and are designed for short-term use.
Issued
May 20, 2026
Expires
September 26, 2026
License
General Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by TCE PRESENTS LLC · 7 permits across 4 neighborhoods
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 975757191 |
| Work Permit # | X01400969-I1-GC |
| Job Filing Number | — |
| Work Type | General Construction |
| Status | Permit Issued |
| Job Description | Temporary structures and rain contingency canopies for a concert outdoors in the parking lot, by TCE presents. Removed at the end of the programing. No changes to existing structures, use or egress. |
| Floor / Unit | Open Space |
| Estimated Cost | $30,000 |
| Approved | May 19, 2026 |
| Issued | May 20, 2026 |
NYC ECONOMIC DEVELOPMENT CORP
Julia Melzer
| Expires | September 26, 2026 |
| BBL | — |
| BIN | — |
Claim this project page to showcase your pricing and attract new clients.