What was permitted
This permit details a significant interior remodel and mechanical upgrade project at 800 Cedar Gln in Austin. The work includes a comprehensive under-house plumbing system replacement, new flooring throughout the 1900 sqm home, wall and ceiling repairs, and window replacement. The kitchen is also receiving a major overhaul with a raised ceiling, new appliances, dedicated wiring for the hood, updated outlets, and new lighting, cabinetry, countertops, and tiles.
The project also encompasses extensive bathroom renovations, including a master bathroom remodel with a new shower pan and niche, and a second-floor bathroom remodel with a relocated toilet and new fixtures. An office renovation involves insulation, new walls, electrical outlets, a ceiling fan, and flooring. Additionally, a new bathroom is being added, requiring structural beam installation and new wall framing. The master bedroom closet is being extended, and the laundry area is being updated with new cabinets and access to the water heater. This permit is active and was issued on June 30, 2026, with MG Heating & Cooling Services LLC as the mechanical contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in South manchaca, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2025-133059 MP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Mechanical Permit · Addition and Remodel |
| Status | Active |
| Job description | interior remodel - Home Remodel -Under house plumbing system replacement -new flooring for the house 1900 sqm -Wall and ceiling repair -replace 35x47 window with the same size and same location Kitchen Remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new AFCI outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles Master Bathroom Remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 GFCI outlets -install 2 recessed light -new cabinets countertops and tiles Second Floor Bathroom Remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 GFCI outlets -install 1 recessed light Office Renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -Install 4 new AC supply grills and extend ductwork and connect to the main HVAC System and Airhandler Bathroom Addition -Remove existing wall separating the future bathroom space from the living area to create the new layout -Install a structural wood beam to support the load-bearing requirements of the removed wall. -Frame and install new walls as per plans -install wall tiles cabinets paint walls -Install fixtures as per plans Master Bedroom Remodel -Extend Master Bedroom Closet as per design layout -install 2 new outlets as per code -install 3 recessed LED Lights and wirings Laundry Remodel -remove existing door and create new access door to water heater tank -install new cabinets |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | August 18, 2025 |
| Issued | June 30, 2026 |
| Expires | February 9, 2027 |
| BBL | — |
| BIN | — |
Related searches