What was permitted
Significant modifications to the existing HVAC system are planned for a property on Seventh Avenue in Manhattan's Midtown-Times Square neighborhood. This involves the demolition and disconnection of HVAC equipment on the 4th Floor.
This permit was issued on September 15, 2026, with a substantial estimated project cost of $504,400. JAMES E FITZGERALD INC is the general contractor for these extensive mechanical system upgrades.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 377612983 |
|---|---|
| Work permit # | M01448418-I1-MS |
| Job filing number | — |
| Work type | Mechanical Systems |
| Status | Permit Issued |
| Job description | Modifications to the existing HVAC System: demolition and disconnections of HVAC equipment and ductwork on the 4th Floor as per plans (BNP Paribas Asset Management.) No change to use, egress or occupancy. |
| Floor / unit | Floor Number(s) 4 through 4 |
| Estimated cost | $504,400 |
| Approved | September 11, 2026 |
| Issued | September 15, 2026 |
| Expires | September 30, 2026 |
| BBL | — |
| BIN | — |
Property owner
Pr
Suzanne Stecich
Related searches